The Renewables Infrastructure Group (TRIG) is set to acquire Vattenfall’s Grönhult onshore wind project, with an installed capacity of 67.2 MW in southwest Sweden.
The Renewables Infrastructure Group (TRIG) is set to acquire Vattenfall’s Grönhult onshore wind project, with an installed capacity of 67.2 MW in southwest Sweden.
As a subscriber, you have reached this page because you are not logged in.