Scatec has signed shareholder agreements with Norfund and EDF power solutions to sell a stake in the 1.1 GW solar and 100 MW / 200 MWh battery storage hybrid Obelisk project, which is currently under construction in Egypt.
Scatec has signed shareholder agreements with Norfund and EDF power solutions to sell a stake in the 1.1 GW solar and 100 MW / 200 MWh battery storage hybrid Obelisk project, which is currently under construction in Egypt.
As a subscriber, you have reached this page because you are not logged in.