The Renewables Infrastructure Group Ltd. (TRIG) intends to sell Phase 1 of the Ersträsk wind farm in Sweden back to Enercon after construction milestones were missed in Phase 2.
The Renewables Infrastructure Group Ltd. (TRIG) intends to sell Phase 1 of the Ersträsk wind farm in Sweden back to Enercon after construction milestones were missed in Phase 2.
As a subscriber, you have reached this page because you are not logged in.